couple of weeks ago the bath tub plumbing froze and damaged the tub valve because the lines were on an outside wall. so to temporally fix this I moved the water lines to the opposite end, no problem. in doing this I fould out there was a stud that I had to notch for the plumbing, sections of the green board was moldy and needs to be replaced, w00t. been at it for 7 hours and everything is only roughed in. tomorrow i’ll have to cut the drywall sections. drill holes for the wall board material and caulk it to make sure it is sealed, yay